Proud Member of NAHB Remodelers
Jeremy on the Jackhammer
Pic of the week the Big guy on the hammer!
Mike cutting a pipe to finished grade height
Here is one of the new sono tubes. The architect must be worried as this baby is 9 feet deep and 3 feet in diameter!
Here is one of the new sono tubes. The architect must be worried as this baby is 9 feet deep and 3 feet in diameter!
Jeremy and mike hooking one of the old piers up to the mini
Things are winding down at this project
Time for the new drive through signs. The old sign concrete piers being removed
Things are winding down at this project
Time for the new drive through signs. The old sign concrete piers being removed
The guys stripping curb forms
The guys stripping curb forms
The guys stripping curb forms
Jeremy building the anchor bolt template for the main menu board sono tube. These are the biggest anchor bolts we have ever used. They don’t use bolts this big on bridges! Designer must have been worried.
Mike and Vinny digging the last hole by hand. The sono tube has to go right where a bunch of wires are buried.
The last of the sidewalks all poured and finished
Mike and Jeremy finishing concrete under threatening skies
Barri and Vinny prepping a section of curbing
Mike inserting dowels
Mike and Vinnie saw cutting drain lines into the floor
The Boss is in the house while the team works after hours cutting floor drains in
Raising the sewer stacks before the pour
Raising the sewer stacks before the pour
Raising the sewer stacks before the pour
Tying rebar
Pouring the side entrance
Jeremy, Broom finishing
Vinny Magging off the concrete
The old man cutting grooves
Had to open two doors to get the float handle in and back out
This many poles takes 2 guys!
Barri on the Mini
Vinny on the jackhammer,
mike setting forms
Vinny and Jeremy discussing the front sidewalk with Mr. Willie Hall, the site Superintendent
The Big Guy dumping stone!
Barri on the Mini
Mike using every pole we have on the bull float
Mike using every pole we have on the bull float
Vinny and Jeremy stripping curb forms
Zach on the tamper
Installing curb forms and sonotubes
Setting new curb forms
Setting new sono tubes for drive through lane
Mike cutting grooves in
The guys with Mr Willie Hall the site Super
Mike, Jeremy and Vinny installing loop sensor
Jeremy backfilling with number 2 stone
Installing dowels between the slabs
Vinny setting up for the pour
Forms in mesh in place waiting for concrete to come down the chute
Preparing to pour the remainder of the drive through
A beautiful sight!
Zach, working the chute
Poured more concrete today. This is the new drive through lane
Mike, Vinny and Jeremy placing concrete
Barri in the mini doing the excavation work
Jeremy on the bobcat with the ram busting up the larger slabs of concrete
Zach, scraping and piling planks
Mike, spraying cure and seal
Mike and Jeremy, cutting grooves
Finishing
Waiting for the first drop. These guys love to pour concrete!
Masters concrete always on time with great drivers
Zach, setting wire mesh
Mike, tamping stone
Vinny checking grade with the laser
Digging out the drive through
Prepping first slab to be poured
Prepping first slab to be poured
Barri Webb of Werth Construction, a great partner of TBC operating the mini
Vinny cutting pavement
Thunderbuilt crew, prepping first segment to get poured