From humble Backyard Retreats to elaborate Lake Houses, Thunderbuilt can help you make the most of your outdoor living space. We'll take your dreams and drawings and make them
a reality that will bring you years of good fun and healthy living.
New job
started FINISHED today! YES, It’s another lake house!!
What a great space!
Deb the “boss” checks out the finished project.
She gave a thumbs up!!
Jeremy installed solid surface countertop on the island.
What a great space!
Rearranged appliances and added a 4 foot island totally transformed the look and workability of the kitchen
Rearranged appliances and added a 4 foot island totally transformed the look and workability of the kitchen.
Well we have buttoned up this lake house. Great project for wonderful people.
Guys bringing in new countertops
Second floor complete
Second floor complete
Mike trimming out bathroom door
Mike and Jeremy setting new bath door
Taping and spackling and more Tongue and Groove;
Here's Bill putting on first coat.
Mike putting up T&G ceiling boards
Jeremy cutting for Mike
Mike and Jeremy ripping the last of the ceiling pieces
Jeremy calling out measurements
Mike nailing up
Closing in on Living room ceiling all done with tongue and groove. Looks great!
Twin chop saws set up so we can cut the angles and square cuts without changing
Mikes got the bathroom walls on the run
Jeremy and Vinny starting on ceiling of living room
Jeremy and Vinny starting on ceiling of living room
Nice accent wall!
Electric going in!
Mike was stuck upstairs plumbing in the new bath and putting in the tongue and groove walls
Guys finished the sheet rock and moved on to the tongue and groove walls and ceilings. Here Vinny and Jeremy are putting pine on living room wall
Tons of action today!
Utility came to set new pole and run new underground wiring to 200 AMP service. Power was only out for 2 hours! NYSEG are you listening????
All heads down and working hard
Another great day on the lake!
Passed insulation inspection, new water line going in, all but 4 sheets of sheet rock installed, & framed in 6 feet of built In cabinets for additional storage.
Here's Vinny putting up sheetrock.
Trenching new water line and electric service
Trenching new water line and electric service
All insulation is in ready to sheet rock
All insulation is in ready to sheet rock
Rain day project was building out a new half bath on the second floor
Partition with door way framed up, Jonny ring and vanity drains installed. Will button her up tomorrow.
Rain day project was building out a new half bath on the second floor.
Here's Mike installing knee wall.
Siding 100% done
Electrical rough in inspection passed
Framing inspection passed
Insulation on Monday
New well line on Monday and new electrical service on Tuesday
On the down hill side of this baby and it looks great!!
The last piece!!
On the down hill side of this baby and it looks great!!
Vinny on the cut table hauling siding to Mike and Sean
Mike and Sean buttoning up siding on gable end
Siding matches the existing home perfectly!
Siding matches the existing home perfectly!
What a beautiful roof!
Installing the last window.
It’s all dried in.
Great progress at the lake.
Here's Mike, installing siding.
Great progress at the lake.
Here's Mike, installing siding.
Looks great!
Looks great!
First three rows of siding all the way around should finish it tomorrow
First three rows of siding all the way around should finish it tomorrow
First three rows of siding all the way around should finish it tomorrow
Craig running electric wires
Siding is going up!
Vinny and mike finishing up soffits and facia
Sun shine and tons of productivity today! Here's Vinny and Mike finishing up soffits and facia
Been very busy at the lake!
Guys got the sub floor for second floor down.
Windows going in!
Here's Vinny and Sean installing a window.
Windows going in!
Gable end getting framed up
Guys cutting through from addiction to existing home.
Mike cutting rafters out so a new header can get installed
Mike measuring for the metal roof order
Jeremy carting materials in
Mike and Jeremy installing sheathing on the back of the addition
Unbelievable weather for February, we will take it. Enjoyed the sun and got tons of things done today!
Exterior sheathing going up!
Going great
Swinging last truss in
Beautiful February day! Set the last two trusses, got the roof sheathing going, installed fascias, built over builds. Good day.
Have a great weekend!!
Jeremy could only reach to set the flat on the walls. Then we slid them down and pushed them up. Mike and Sean would scramble around and get it secured.
The big guy freezing his butt off in the lift swinging the trusses into us.
Number one
Moving the trusses to where the lift could get a hold on them.
Good day!
Guys putting top plate on center wall
Meanwhile Lasher Construction is installing a new septic tank in front yard.
Jeremy installing top plates
Mike and Jeremy laying out wall separating bedrooms and living room
Mike calling out window sizes to the guys
Good framing day! Got the walls stood up and braced off.
Here's Vinny and Jeremy laying out the back wall.
Sub floor on walls tomorrow.
Trusses by the end of the week.
Mike cutting through into existing home to verify second floor height
Vinny humping sub flooring
Mike and Jeremy working on the last few sheets of sub floor
Sub flooring going down
Guys ripping OSB to put between joists to support insulation and keep wind and critters out
Insulated the floor system and put down the sub flooring. Cold but it’s going to be colder as we go
This may be the muddiest site we've ever had.
Had a good day. Got the beams built and floor joists and rim boards on. Framing was inspected and passed so tomorrow we insulate the floor and install subfloor.
This may be the muddiest jobsite we've ever had.
Had a good day. Got the beams built and floor joists and rim boards on. Framing was inspected and passed so tomorrow we insulate the floor and install subfloor.
Had a good day. Got the beams built and floor joists and rim boards on. Framing was inspected and passed so tomorrow we insulate the floor and install subfloor.
Drains, vapor barrier and stone all in place.
Monday we start building to addition
Drains, vapor barrier and stone all in place,
Monday we start building to addition
Lasher Construction added additional drainage piping under addition.
Lasher Construction added additional drainage piping under addition.
Lasher Construction added additional drainage piping under addition.
Good things today- two Bald Eagles on our job site! Very cool. Also, got the posts all set and to grade.
Bad things today-MUD!
Here's Mike in the pit. Ready for drain piping, stone and vapor barrier.
We got MUD!
Need it to freeze!
Everyone is wet and cold but happy to get these piers in place.
Now we build!!
Everyone is wet and cold but happy to get these piers in place.
Now we build!!
The last one. Everyone is wet and cold but happy to get these in place. Now we build!!
Swinging a pier into place guys working on number 7
Pier number 1, on its way into the hole.
Mike and Jeremy cut off the overhang of existing home where addition will attach
Good day today despite strong wind and blowing snow. Got all 12 piers places below frost line
Baby blizzard didn’t stop Lasher Construction from getting a full day in at KN78 prepping the site for piers and retaining wall
Grade is pretty close
Piers go in on Wednesday if all goes well
Mike and Jeremy remove a portion of existing house to establish our finish floor height.
The trusses can sit right there till we need them.
The trusses can sit right there till we need them.
Slowly hauling the trusses to the site. Better than carrying them in by hand!!
Road to house was too small to get tractor trailer of trusses to the site. Fortunately Lasher Construction was here to help with the excavator!
Road to house was too small to get tractor trailer of trusses to the site. Fortunately Lasher Construction was here to help with the excavator!
Road to house was too small to get tractor trailer of trusses to the site. Fortunately Lasher Construction was here to help with the excavator!
We started this project in October.
It’s called BN11. The project is an addition to an existing home. Excavation for the Footer and frost walls started today. We needed to get it in the ground before the frost hits!
Bricks are about half gone.
Here's Mike installing siding. It's a beautiful vinyl board and batten style. We have not worked with this specific product in the past and we are impressed with the quality and the look.
Started siding today. Beautiful vinyl board and batten style. We have not worked with this specific product in the past and we are impressed with the quality and the look.
Here's Vinny and Jeremy coming around the corner.
Started siding today. Beautiful vinyl board and batten style. We have not worked with this specific product in the past and we are impressed with the quality and the look.
Here's Mike, Vinny and Jeremy starting on the rear wall
Jeremy using demo saw to cut bricks
Guys cut through the existing brick wall so we can frame addition directly to the existing house framing.
Mike cuts second side of the brick wall.
Snap-in basement got poured today. Tri-State team running power-trowel to finish slab.
Snap-in basement got poured today. Tri-state team running power-trowel to finish slab.
Jeremy's suspenders broke.
Pants on the ground!
Another delivery of trusses for the upcoming project.
Another delivery of trusses for the upcoming project.
Vinny and Jeremy framing up the laundry room and hallway that will lead to the living protion of the addition.
Vinny and Jeremy framing up the laundry room and hallway that will lead to the living protion of the addition.
Lake House Rebuild!
While we wait on materials for other projects we started on our next project. Yes it’s another lake house!!
We will be tearing off the deck and rear 12 feet of the home to reestablish a solid foundation. The original foundation was made up of inadequate piers. We will do a new addition, total new roof, new windows and doors, siding and a new composite deck. This will be a total transformation so stay tuned!
One side done
All debris removed and lawn put back together
Mike installing siding on the back of house
Jeremy, installing last window
Windows finally arrived.
The Lake side is done!
Last of the soffits and fascia going up on the porch
Last of the soffits and fascia going up on the porch
Guys ripping an 18 foot piece of PVC trim lumber.
New flooring is all down. Looks great! We wait for windows that were supposed to be here almost a month ago.
New flooring is all down. Looks great! We wait for windows that were supposed to be here almost a month ago.
New flooring is all down. Looks great! We wait for windows that were supposed to be here almost a month ago.
Great color choice!! This is how far we can go on this side till the windows arrive on Wednesday.
Siding going up! Mike installing corners
Vinnie and Jeremy installing first row of siding.
The guys installed the porch ceiling. It’s a vinyl bead board material. It’s maintenance free and quite lovely.
Roof 100% done
Peranich & Shelp roof team swarming the project
First sheet going down
Vinny and Jeremy installing Sun flooring
Best roofing company in the area by far! Peranich and Shelp
Stairs from porch to lake side
Vinny and Jeremy putting PVC trim on main beam supporting porch roof
Steve Insulating the kitchen
Mike sheet rocking kitchen
Vinny trimming out beam with PVC
Great day at the lake!
Here's Vinny and Jeremy installing porch railing system.
And Mike building stairs from deck to lake side lawn
Vinny and Jeremy installing porch railing system.
Mike building stairs from deck to lake side lawn
Mike and Steve cutting PVC stringer trim
Yes it’s railing day!
Lots of boxes of parts
Very clean and maintenance free!!
Very clean and maintenance free!!
Vinny and Jeremy installing posts for porch railing
Jeremy installing railing posts
Porch deck all done, railings next
Porch deck going down!
Vinny and Jeremy running the decking for porch
Mike running the last of the house wrap. She’s ready for new siding and windows
Had two great visitors today! Ms Emma and Mr Lane stopped by
Jeremy installing Picture Frame for porch decking
Porch deck going down. Jeremy and Vinny installing the picture frame, composite deck boards to follow
Jeremy routing out new windows on porch
Gus filling in sheathing where chimney was
Mike replacing old rotten fascia
Guys installing new fascias
Many different tasks going on today. 90% of new wiring is done.
Vinny and Jeremy finish removing old unused chimney
All wrapped up in house-wrap and ready to side
All wrapped up in house-wrap and ready to side
One wall ready for siding.
House wrap going up.
Mike and Steve get it nice and tight.
Mike cutting in new window in second floor bedroom
Old unused chimney coming down
Vinny and Jeremy doing a bit of repair to a rotten portion of laundry room exterior wall
Porch roof rafters installed and all the sheathing on. Very good day!!
Here's Vinny installing ZIP roof sheathing on porch.
Sheathing all on
Sub floor of the second floor Bedroom
Lake view from second floor bed room
Lake side all sheathed and porch roof ledger board in place
Porch roof beam
Jeremy cutting posts to the correct height
Old fascias, soffits and gutters coming down
Collar ties going in in ceiling of new bedroom
Wonderful day!! Sun shine, blue sky and aerial display by our eagle friend
Installing fascias
Mike working top side
Fascia ladder going up
Weather has not been very cooperative but we are progressing nicely.
We enlarged the opening between kitchen and living room
View from kitchen out to living room
Installing fascias.
Sheathing tomorrow if no rain!!
Guys framing lakeside wall
Vinny and Mike installing rim board
Lakeside wall up and all plumbed up
Mike installing joist hangers
Tomorrow second floor floor system and sheathing goes in
Our eagle comes everyday and watches us from his favorite tree across the lake, Very cool.
Second floor joists all done
Second floor system decking going in
Tomorrow second story flooring system and sheathing goes in
Lakeside wall up and all plumbed up
Guys framing lakehouse wall
Second wall going up
First house wall UP!
First house wall UP!
Bit damp and chilly but a good day all in all
All the deck joists installed and the landing for the stairs all framed up as well
Joists going in
The guy’s preparing to set the floor joists for the deck
One would think the milling on this lumber would be better for the price you pay!! Here Mike is ripping down a 2x10 that was a 1/4 inch too wide
Mike and Vinny laying out for floor joists
Hauling lumber down from the road
Great day! Got to start rebuilding this baby! Living room beam, floor joists, & sun flooring all down.
Guys spreading stone
Piers set, Geo tech fabric in place & 6 inches of crushed stone spread across the entire area below the new addition and deck
Making the triple 2x12 pressure treated beam
Vinny and Mike setting first pier
Pre cast piers arrived from Masters Pre cast
Putting in a much needed drainage ditch
100% of demo done and in the dumpster.
Time to re-build this baby!!
Last big demo day. Time to
re-build this baby!!
Last big demo day. Time to
re-build this baby!!
Mike and Vinny jacking the corners of remaining house to get them back to level
String lines up and Piers all laid out. Digging and placing them tomorrow before the rains begin
All the old piers are coming out as they are not below the frost line and subject to heaving every winter.
Our friend was back again fishing
Mike down below while Jeremy and Vinny work the topside
Time to haul all this stuff up the hill to the dumpster
Vinny and Mike both wielded sawzalls
Jeremy cutting out floor
Mike cutting out floor system
Jeremy working hard, taking the floor of second floor bed room up
Another good day of Demo. 4th dumpster out and 5th waiting to be filled. Demo ends tomorrow. Rebuild starts next week!
Always stop and stare in awe when our National symbol, the mature Bald Eagle soars above
Jeremy removing portion of deck roof
More demo today. Roof and second floor bedroom all gone. Roof of old deck all gone. Living room and deck will be gone tomorrow.
More demo today. Roof and second floor bedroom all gone. Roof of old deck all gone. Living room and deck will be gone tomorrow.
This was yet another lake house! We really enjoyed this job and the homeowners couldn't be happier!
Beautiful front porch!
We do great work if I do say so myself!
Looking back from lake shore
View from the porch
Shot of the walkway to front porch
Porch roof framing done.
Railings complete
Vinny and Mike installing over build
Vinny and Mike installing over build
Mike
Guys installing porch framing and railing on the deck
Mike and Jeremy installing railings
Mike and Vinny installing porch posts
Porch beam going up
View of the finished interior
Ms. Emma showed up on her 5th birthday to say hello!
Vinny and DJ installing siding
Great progress!
This place is super cute!
View of the finished interior
Mike and Jeremy installing composite porch decking
Great progress! This place is super cute!
LP Smart Siding being installed by Mike and Jeremy
LP Smart Siding being installed by Mike and Jeremy
DJ installling trim
Vinnie on the Chopsaw
Ahh! Perfect!
Vinnie, setting beam.
Place is small but super cute and cozy
Sidewalk to/from deck
Someone got a haircut!
Side walkway tied into front deck
DJ, trimming windows
View out the front lake side wall
Mikes Birthday and everyone stopped for cake. Ms. Emma and Mr. Lane joined us as well.
Set trusses today. Here’s Mike waiting for sheathing to be lifted up
Guys are doing a fantastic job running the tongue & groove on the interior walls.
Guys are doing a fantastic job running the tongue & groove on the interior walls.
Guys are doing a fantastic job running the tongue & groove on the interior walls.
Vinny and DJ started running pine tongue and groove boards in this lake house. Great look!!
Vinny and DJ started running pine tongue and groove boards in this lake house. Great look!!
Vinny and DJ started running pine tongue and groove boards in this lake house. Great look!!
Vinny and DJ started running pine tongue and groove boards in this lake house. Great look!!
Boys got her all insulated.
Tongue and Groove pine boards next
Boys got her all insulated.
Tongue and Groove pine boards next
Boys got her all insulated.
Tongue and Groove pine boards next
Boys got her all insulated.
Tongue and Groove pine boards next
Jeremy setting one end Mike on the other
One of the two largest windows facing lake
DJ sheathing last side
Vinny nailing up sheathing
Sheathing going on, house wrap going on windows going in. Perfect day to be a builder!
Here's Mike and Jeremy sheathing back of cabin.
Mike and Jeremy framing up porch floor
View into the front of the house from shore line
Deb The Boss chats with the owner, Mike and Jeremy about adding a walkway along the side of the house to front porch
SPECIAL ANNOUNCEMENT!
Thunderbuilt Construction has identified a future crew leader!
Lane Depersis; currently 9 weeks old, limited experience but promises to be just like his Dad!!
Guys installing over builds and fascias
Very cute cottage
Vinny nailing down roof sheathing
Guys installing over builds and fascias
Roof all sheathed and metal roofing on its way
Mike framing up the front wall
This view of the lake is great
This view of the lake is great
Wall going up. Enlisted the owners assistance with the lift
Here the deck is on
Mike and Jeremy with the owner. The guys are laying out the front wall. It has a door and 5 large windows
Deck is down and guys are taping sun floor seams
First floor framing going in
Matty backfilling new septic tank
View of new lake house from shore line
We started yet another lake house today. We'll call it JS25.
Follow Thunderbuilt's progress while we make something awesome happen!
The New house is going where this bath house is.
Thunderbuilt crew on site ready to go
Vinny and Jeremy disconnecting bath house
Matty Clark on site as always
Matty Clark on site as always
First load from Belknap
Bath house getting relocated
Mike and Jeremy laying out posts
First post in Mike Vinny and Matty
Vinny and Jeremy setting posts
Mike cutting posts off to height
Our boy Matty
Thunderbuilt re-framed this dock on a beautiful local lake.
We followed up with new windows and a magnificent deck for our clients.
Guys did great, as always!
New lake side wall over looking new deck and new dock. This is nice.
Boys killed it on this project.
Perfect!
Former sun porch now incorporated into the Great room.
Vinny cutting railing components
Jeremy and Vinny installing new railing system
New dock surface going down
View of fascia tape and wafer LED lighting. This will be without a doubt the nicest dock on the lake!!
DJ trimming out new windows
Jeremy on the saw table with the Boss in the background
New composite decking with a complimentary picture frame
Been a while since we posted pics. We are jamming flat out and the “season” is just getting started!
Here's Mike and vinny installing new deck.
View of fascia tape and wafer LED lighting. This will be without a doubt the nicest dock on the lake!!
Dock all reframed. Now low voltage LED lighting will be run then the composite decking will be installed.
Emma the next generation of TBC. Her idea of fun is taking Dads old prints and drawing in the stuff she wants!!
Caution is called for! The water isn’t deep but it’s freeeeeeezing!
Caution is called for! The water isn’t deep but it’s freeeeeeezing!
Caution is called for! The water isn’t deep but it’s freeeeeeezing!
At lunch DJ kept the waders on and landed a nice Brown
DJ had chest waders on all day the old man of the sea!
DJ had chest waders on all day the old man of the sea!
Mike and jeremy
The Boss had foot surgery but she’s out here every day on QC.
Vinny working saw table
Caution is called for! The water isn’t deep but it’s freeeeeeezing!
Vinny working saw table
DJ trimming out new windows
Started re-framing this dock on a beautiful local lake. Perfect spring day with a nice stiff breeze, actually blowing white caps! Guys did great!
Here's Kohl humping pressure-treated lumber down to the dock.
We started on a large dock project in March. We removed the old dock. We'll reframe the dock and cover it with a two tone composite lumber deck. This deck will have low voltage perimeter lighting. Should be a fun project.
Ready to be rebuilt
Ready to be rebuilt
Ready to be rebuilt
Ready to be rebuilt
Good balance. He knows how cold that water is and it’s a long way home
Good balance. He knows how cold that water is and it’s a long way home
Vinny, Jeremy and DJ removing old dock
This project is winding down and it looks GREAT!
This project is winding down and it looks GREAT!
This project is winding down and it looks GREAT!
This project is winding down and it looks GREAT!
Materials for skirting finally arrived and not a moment too soon. Trying to get all skirting done before the ice goes out. We made it with only hours to spare. The remainder we can do from the top.
Materials for skirting finally arrived and not a moment too soon. Trying to get all skirting done before the ice goes out. We made it with only hours to spare. The remainder we can do from the top.
Materials for skirting finally arrived and not a moment too soon. Trying to get all skirting done before the ice goes out. We made it with only hours to spare. The remainder we can do from the top.
Materials for skirting finally arrived and not a moment too soon. Trying to get all skirting done before the ice goes out. We made it with only hours to spare. The remainder we can do from the top.
Materials for skirting finally arrived and not a moment too soon. Trying to get all skirting done before the ice goes out. We made it with only hours to spare. The remainder we can do from the top.
Materials for skirting finally arrived and not a moment too soon. Trying to get all skirting done before the ice goes out. We made it with only hours to spare. The remainder we can do from the top.
Materials for skirting finally arrived and not a moment too soon. Trying to get all skirting done before the ice goes out. We made it with only hours to spare. The remainder we can do from the top.
Materials for skirting finally arrived and not a moment too soon. Trying to get all skirting done before the ice goes out. We made it with only hours to spare. The remainder we can do from the top.
Dock all stripped and ready for repairs / rebuilding- in time for Boating Season.
Materials for skirting finally arrived and not a moment too soon. Trying to get all skirting done before the ice goes out. We made it with only hours to spare. The remainder we can do from the top.
Dock all stripped and ready for repairs / rebuilding
Dock all stripped and ready for repairs / rebuilding
Jeremy removing decking
Siding is done
This fantastic project comes to a close for us. The owner will be finishing the interior. We wish them many happy years at their Lakehouse!
Sweet Lakehouse, all done.
Mike and Jeremy moving one of three ceiling-to-floor book cases.
Book cases finally arrived so we could install and complete this great project!
More windows
More windows
Soffits and fascia going up
Vinny installing 1,000,000 spindles- or so he says
Deck going on
Max and Vinny setting huge slider windows facing lake
Windows going in
Deck joists
Jeremy building the triple beam for the decks
Vinny and Max digging post holes for the deck
Jeremy using laser level to establish deck height
Deb helping mike frame up the interior stair case
Deb, hauling lumber in the window
Deb and mike surveying the progress on the deck construction
Mike running soffit and fascia
Ridge board up.
Ready for rafters.
Setting the ridge board
Setting the overhangs
Overbuilds and fascia all in as well
Perfectly proportioned roof system
Jeremy cutting rafters
Ready for the next phase.
Pretty good day!
Vinny and Jeremy on the saw table cutting rafters
Vinny and Jeremy framing up bathroom window
Joists in
Matty making the septic tank connection.
Matty Clark on the mini, finishing the the grading.
Beams in place.
First floor joist going in.
Laser out posts getting cut off to the proper elevation. Is that sun shine?
It poured all day. Posts going in
What a great dock!